Chamoli tunnel incident death toll rises to 11 as rescue operations end

Preliminary assessments suggest that the tunnel was inundated after a rain-saturated aquifer ruptured through the roof of the three-km-long tunnel, about 1.44km from its entrance

Preliminary assessments suggest that the tunnel was inundated after a rain-saturated aquifer ruptured through the roof of the three-km-long tunnel, about 1.44km from its entrance

About the Author

Leave a Reply

Your email address will not be published. Required fields are marked *