GCC Commissioner G.S. Sameeran inspects development works under way at the canal, including the construction of retaining walls and removal of silt and waste, at an estimated cost of ₹30 crore
Work on storm-water drain near Virugambakkam canal to be completed in 2 weeks
GCC Commissioner G.S. Sameeran inspects development works under way at the canal, including the construction of retaining walls and removal of silt and waste, at an estimated cost of ₹30 crore
Previous Post
Next Post
Leave a Reply
Latest News

Stay Connected
Categories
Business Health India Politics Science Sports Technology Uncategorized World
Tags
About the Author

AF themes
Easy WordPress Websites Builder: Versatile Demos for Blogs, News, eCommerce and More – One-Click Import, No Coding! 1000+ Ready-made Templates for Stunning Newspaper, Magazine, Blog, and Publishing Websites.

Search the Archives
Access over the years of investigative journalism and breaking reports
You May Have Missed



