With Tamil Nadu CM Vijay opening the Mettur dam, focus turns to longevity of water release

On Tuesday (September 1, 2026), the water level stood at 91.56 ft with the storage being about 54.45 thousand million cubic feet (tmc ft). The dam’s full level is 120 ft and the capacity is 93.47 tmc ft

On Tuesday (September 1, 2026), the water level stood at 91.56 ft with the storage being about 54.45 thousand million cubic feet (tmc ft). The dam’s full level is 120 ft and the capacity is 93.47 tmc ft

About the Author

Leave a Reply

Your email address will not be published. Required fields are marked *

About the Author

Easy WordPress Websites Builder: Versatile Demos for Blogs, News, eCommerce and More – One-Click Import, No Coding! 1000+ Ready-made Templates for Stunning Newspaper, Magazine, Blog, and Publishing Websites.

BlockSpare — News, Magazine and Blog Addons for (Gutenberg) Block Editor

Search the Archives

Access over the years of investigative journalism and breaking reports